Juhua fluorination company put into production does not increase pollution

Juhua Fluorination Co., Ltd. actively carried out sewage control and technical research activities. With the R-134a plant put into operation and achieving a production capacity of 10,000 tons and two CDM projects put into operation, the increase in production did not increase pollution. A few days ago, after inspection and statistics, the discharge amount of waste water dropped by 13300 tons year-on-year, and the sewage treatment expenses decreased by 45% year-on-year.
The fluorination company has 10 sets of main production facilities. There are more than 20 sets of facilities for pollution prevention and resource utilization in the installations, and the supporting rate of pollution source control facilities is 100%. Both of them maintain normal and effective operation, and the treatment effect is significant.

This entry was posted in on